Titolum
OEM equipment buildersIllustrative example

OEM Equipment Builder — Titanium OEM Components Example

A revision-controlled OEM component and a two-part interface set, supplied against the released drawing revision with the dimensional report linked to it.

Case Summary

Case summary for OEM Equipment Builder — Titanium OEM Components Example
ItemSpecification
IndustryOEM equipment builders
Part familyTitanium OEM Components
MaterialTitanium, grade quoted against the standard specified on the drawing
Tolerance±0.05 mm (evaluated by feature and drawing)
BatchScheduled call-off orders against a released drawing revision
FinishingSpecified per revision; passivation records supplied where the treatment is part of the specification
InspectionFAI on the first production run, dimensional report linked to the revision, material certificate 3.1
Lead timeConfirmed per order after drawing review
Repeat scenarioCall-off orders against a released revision, revision changes handled through a documented difference list, and repeat orders placed from the archived drawing and inspection record.

This is an illustrative example describing a typical scenario. It is not a confirmed client transaction, and no client or supplier identity is disclosed.

Industry Context

An equipment manufacturer embedding titanium components in its own product carries a different burden from a one-off buyer: the part is shipped under the OEM brand, so the drawing revision, the interface dimensions and the inspection evidence have to stay traceable for the life of the product.

Part and Drawing Characteristics

The example covers a single component supplied against an OEM drawing revision and a two-part interface set sharing one tolerance stack. Interface dimensions were agreed before production rather than inherited from whatever the parts happened to measure, and the drawings defined the features that matter to the assembled product.

Manufacturing Decision

The components were machined within 3-axis and 4-axis CNC milling scope, and the parts of an interface set were produced in one batch so the mating features share the same setup reference. Where an interface dimension sat inside a tight stack, it was held deliberately rather than inherited from the process capability, and the DFM discussion was closed before the quotation was issued.

Inspection and Delivery

FAI was run on the first production run and the dimensional report was linked to the released revision number, so any later question can be answered against the exact revision that was produced. The material certificate 3.1 and, where the specification required it, the passivation record ship with the parts, with export documents and packing photos issued before dispatch.

Repeat Order Scenario

Call-off orders are placed against the released revision and quoted from the archived drawing and inspection record. When the OEM revises the drawing, the change is handled as a documented difference list against the previous revision, and the FAI report from the first run is archived so later call-offs can be traced back to it.

Other Examples

Upload a Similar Drawing

Send the drawing and we will confirm the features that drive tolerance, the batch size that fits your schedule, and the inspection documents you receive.