Titolum

Quality

Quality and Inspection

What we check, what documents you receive, and how dual sourcing protects quality.

Inspection Workflow

The inspection plan is agreed before quotation, so the documents you receive are known before you order.

  1. 1

    Drawing review

    Critical dimensions and tolerance features identified before production.

  2. 2

    First article inspection (FAI)

    First part measured against the drawing before the batch continues.

  3. 3

    Dimensional report

    Key features recorded and shared before shipment.

  4. 4

    Finishing confirmation

    Surface treatment checked against the specification.

  5. 5

    Pre-packing final check

    Visual and dimensional spot check; packing photos taken.

Documents You Receive

  • ✓First article inspection (FAI)
  • ✓Dimensional inspection report
  • ✓Material certificate 3.1 (EN 10204)
  • ✓Finishing record (where applicable)
  • ✓Packing photos

Document set is confirmed before quotation. If a supplier cannot provide a required document, we say so before you order.

Why Dual-Source Quoting Protects You

The same drawing is quoted by two qualified suppliers independently. We compare their process plan, inspection capability and lead time — not only price. If one supplier cannot meet the inspection requirement, we do not simply switch to the cheaper one. This is a quality control mechanism, not a bargaining tactic.

Scope Boundary

We only quote parts within 3-axis / 4-axis scope at ±0.05 mm (evaluated by feature and drawing). Parts outside this scope are declined at review stage — before any quotation, not after.

  • 5-axis complex surfaces— outside the 3/4-axis scope of our qualified suppliers.
  • Ultra-thin-wall or high-deformation parts— risk of out-of-tolerance results and warping.
  • Sintered titanium filter elements— a powder-metallurgy process, not CNC machining.
  • MMO-coated titanium anodes— a coating and electrochemical process, not machining.
  • Welded titanium baskets or racks— welding and assembly, not machining.

Review the Inspection Plan With Your Drawing

Send the drawing and we will confirm which inspection documents apply to it before quotation.