The Complete Loop
Eight steps, in order. Each one ends with a document, so you always know what the next step starts from and what you will have in your hands when it ends.
1Upload drawing
Acknowledgement within one business day
2Engineering review
Review result and open questions
3Supplier matching
Released drawing revision and confirmed inspection plan
4Dual-source quotation
Consolidated quotation with lead time and document list
5Order confirmation
Order confirmation and production schedule
6Production & inspection
Inspection documents, released before shipment
7Export delivery
Export documents and delivered parts
8Repeat order
Archived record, fast-track quotation and a new order in the same loop
Closed loopStep 8 feeds step 1. The archived drawing, material certificate and inspection record become the input of the next order, so a repeat order skips the engineering review and starts from a known-good specification.
What to Expect, and When
Two clocks, kept separate: how long we take to answer you, and how long the parts take to be made once the order is confirmed. Manufacturing time depends on batch size.
Our response
Titolum response times| Step | Time |
|---|
| Acknowledgement | within 1 business day |
|---|
| Engineering review | typically 1–2 business days, depending on drawing complexity |
|---|
| Quotation | 2–4 business days after the review is confirmed |
|---|
| Lead time | confirmed per order; small batches and repeat orders are quoted separately |
|---|
Manufacturing time at the supplier
Supplier manufacturing lead times by batch size| Batch size | Typical duration |
|---|
| 1–20 pcs | 3–5 working days |
|---|
| 20–200 pcs | 5–10 working days |
|---|
| 500+ pcs | 10–18 working days |
|---|
| Surface finishing | Adds 2–3 working days for blasting, pickling or anodizing |
|---|
Every quotation carries a specific committed date. Repeat orders and small batches are quoted separately, because the archived specification usually shortens both the review and the manufacturing time.
Ordering Again Is the Point
The first order is engineering work. The second order is a lookup. The drawing revision, the material certificate and the inspection record are already on file, so the repeat quotation comes back faster and the inspection plan is already known.
You send the order reference
The drawing number or order number from the previous delivery, plus the new quantity.
We pull the archived record
Released drawing, material certificate, inspection plan and measured results — the exact state that was shipped.
You get a fast-track quotation
Same specification, updated lead time, and a clear statement if a drawing revision requires a new first article.