Titolum

Part Family

Titanium Shafts & Bushings — Custom Machined to Drawing

Custom titanium shafts & bushings machined from titanium within 3-axis CNC milling / 4-axis CNC milling scope at ±0.05 mm (evaluated by feature and drawing).

Typical geometry schematic — reference structure only, not a stock part.

Typical Features

Shafts, bushes and sleeves with turned and milled features.

  • ✓Stepped shafts with journals, shoulders, retaining-groove and undercut features
  • ✓Keyways, flats and threaded stubs combined with turned diameters
  • ✓Sleeves and bushes with press-fit, flanged or grooved ends
  • ✓Concentric features where turning and milling are combined in the same drawing

Reference Structures

Typical geometry in this family. These describe the shape, not a stocked part — dimensions, tolerances and quantities follow your drawing.

  • Stepped shaft with a central journal and a smaller drive end
  • Plain sleeve bush with a flanged end
  • Grooved bush with an anti-rotation slot

Material, Tolerance & Finishing

Materials, tolerance and finishing for Titanium Shafts & Bushings
ItemSpecification
MaterialsGrade 2, Grade 5 (Ti-6Al-4V), Grade 7, Grade 9Grade is quoted against the standard you specify on the drawing.
Tolerance±0.05 mm (evaluated by feature and drawing)Roundness, step diameters and coaxiality are evaluated per feature; runout is confirmed against the datum scheme on your drawing.
FinishingAs machined, Passivation, Bead blasting, Anodizing (if supplier-supported)As-machined is common for wear parts; passivation or blasting is added when a surface specification is required.
Finishing lead timeAdds 2–3 working days for blasting, pickling or anodizing.

Batch & Lead Time

Batch range: Prototype to medium batch (typically 1–500 pcs). Manufacturing time below is the time at the supplier once the order is confirmed; our own review and quotation time is quoted separately.

Lead time by batch size
Batch sizeTypical durationDriver
1–20 pcs3–5 working daysLocal stock cutting; setup and tolerance trimming dominate.
20–200 pcs5–10 working daysStandard shop scheduling, including deburring and cleaning.
500+ pcs10–18 working daysSuitable for automatic-feed turning and dedicated machining centres.

Lead time is confirmed per order. Every quotation carries a committed date, and repeat orders are quoted from the archived drawing record.

Quality Documents

The documents below ship with the order. The inspection plan is agreed before quotation, not after production.

  • ✓First article inspection (FAI)
  • ✓Dimensional inspection report
  • ✓Material certificate 3.1 (EN 10204)

What we report for this family

  • Diameter and roundness at each step, measured at the callout stations
  • Runout between the journal and the driven feature
  • Bush bore diameter and press-fit surface finish
How inspection is carried out →

Where These Parts Are Used

Application notes describe typical use. Suitability for your equipment is confirmed from the drawing and the service conditions.

Repeat Purchase Scenarios

Most orders in this family are not one-off. Once the drawing is approved and the inspection report is on file, re-ordering becomes a matter of referencing an archived record.

  • ✓Consumable replacement schedules — bushes and wear sleeves are re-ordered on wear intervals
  • ✓OEM spare-part programmes for shaft assemblies
  • ✓Match-set re-orders where parts from one assembly are produced together

Related Example

Illustrative examples describe typical scenarios, not confirmed client work.

Other Part Families

Upload Drawing for This Part Family

Send the drawing and we will confirm the features that drive tolerance, the batch size that fits your schedule, and the inspection documents you receive.

This part family is not in your drawing? Send it anyway — we will confirm fit honestly.